Taiwan Power Company
Hu-Ging distribution substation EPC project Along with the growth of Taiwan
economics, the demand for a stable and reliable power
environment is higher than before. Hence, Taiwan Power
Company commenced phase 6th Power Transmission &
Distribution project which will convert the facilities
and power lines to be indoor. This project also
improves the outdoor old transmission & distribution
lines. AEC is the main contractor of Taiwan
Power Company Hu-Ging distribution substation EPC project.
Taiwan
Semiconductor Manufacturing Company (TSMC)
As semiconductor OEM industry in Taiwan grew rapidly
in past 10 more years, AEC's switchgears and transformers
have been installed and operating in fab 3, fab 4,
fab 6, fab 7, fab 8 of Taiwan Semiconductor Manufacturing
Company (TSMC) in Hsin Chu Science Park and Tainan
Science Park. In 2004 TSMC placed orders of
AEC switchgear, 750kVA 3 Phase parallel UPS x 16 units,
and 500kVA 3 Phase parallel UPS x 13 units for
fab 12B.
UMC
AEC's reliable, safe, maintenance-free
cast resin transformers have been operating in the 8-inch
& 12-inch wafer fab 1, fab2, fab3, fab 4, fab 5,
fab 12A of UMC.
Taiwan
High Speed Rail AEC joined the planning of electrical
equipment and design at the initial phase of Taiwan
High Speed Rail 10 years ago. In the recent 2 years,
AEC has been dedicated in supplying and installing Wayside
E&M System, High/Low voltage switchgear, OCS, etc.
for Taiwan High Speed Rail to ensure proper operation
of their stop stations.
Switching
Mode Rectifier(SMR) for Telecommunication Company of
Iran(TCI) In 2003 AEC SMR was successfully
launched to Telecommunication market of Iran.
Now more than 4500 units of SMR module and 1500 sets
of system are operating in base stations of TCI
and MCI in many provinces of Iran. As the telecommunications
market of Iran is gradually going public, there will
be a remarkable growth of SMR application.
Switching
Mode Rectifier(SMR) for Greek PTT and OTE Greece
Greek PTT has been purchasing
AEC SMR since 2002. The reliability of AEC SMR guaranteed
uninterrupted power to 2004 Olympic held in Athens.
In the past two years, major telecommunications company
like OTE also used many AEC SMR. Our market share in
Greece is now 90%.